Prepare coordination meetings
Find open actions by contractor and identify outstanding responses before the meeting.
OPC consultants
Coordinate contractors through actionable meeting reports, assigned actions and shared snag tracking between site visits.
Less retyping. Continuity between visits.
17 September 2026·8 attendees
3 / 4 tasks complete
4 / 4 tasks complete
1 / 4 tasks complete
2524 Finding pinned to plan Building A · Roof
Building A · Roof
In practice
Coordinate contractors through actionable meeting reports, assigned actions and shared snag tracking between site visits.
Find open actions by contractor and identify outstanding responses before the meeting.
Keep an owner and deadline against each action in the meeting report.
Follow snags and remedial work with contractors through to verification.
The product at work
Les Tilleuls development: follow the same project from the first action to the final document.
Step 01
Add a photo, location, contractor and deadline so the item can be acted on straight away.
Roof terrace · Drawing revision B
2425+Step 02
Decisions and open actions feed into your report. Each item keeps its number across meetings.
17 September meeting · 8 participants
Step 03
At the next visit, find your checks, open items and site documents together.
17 September visit · Building A
17 September meeting · 8 participants
Turn every site visit into a report and actions you can follow.
Roof terrace · Drawing revision B
2425+Track and close out snags, through to the reception record.
The next stage of your project
Start with your own documents and organisation to explore the features your team needs.
Coordinate contractors through actionable meeting reports, assigned actions and shared snag tracking between site visits.
Would you rather talk it through?
+33 6 67 33 82 14We'll call you back within one business day.
Your information is used only to answer your request.