Work progress

From site to shared report.

Run site meetings, track progress by trade, and turn findings on the plan into actions in your meeting report.

Less retyping. Continuity between visits.

THE PRODUCT IN ACTION
builddar.Les Tilleuls / Building AML
WORK PROGRESS

Site meeting #12

17 September 2026·8 attendees

Joinery75%

3 / 4 tasks complete

Tiling100%

4 / 4 tasks complete

Painting25%

1 / 4 tasks complete

Roof terrace2 pinned findings
Roof drawing with finding 24 connected to a site meeting action 2524 Finding pinned to plan
FINDING #024 To assign

Parapet joint to repair

Building A · Roof

Assigned to
MMartin waterproofing
Due date
21/09/2026

In practice

What does Work progress do?

Builddar Work progress brings site reports, snag tracking, progress checklists, documents and reporting into one project for architects, site supervisors, OPC consultants and main contractors.

The product at work

From the first action to the result.

Les Tilleuls development: follow the same project from the first action to the final document.

Step 01

Capture on site

Add a photo, location, contractor and deadline so the item can be acted on straight away.

A clearly documented site item
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Snags on planTeam view

Roof terrace · Drawing revision B

All 3To fix 1To verify 1Closed 1
Architectural roof terrace plan with located snags2425+
A · Roof
024
Parapet joint repairMartin waterproofing · 21/09
To fix
025
Vent outlet fasteningDurand ventilation · 22/09
To verify
026
Roof terrace cleaningMartin waterproofing · 18/09
Closed

Step 02

Share the meeting report

Decisions and open actions feed into your report. Each item keeps its number across meetings.

A report ready to share
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Meeting report no. 12Draft

17 September meeting · 8 participants

AttendanceDiscussion points 3Attachments
DECISIONS & ACTIONS
01
Approve the façade colourArchitect · Due 21/09
To approve
024
Parapet joint to repairMartin waterproofing · Due 21/09
In progress
03
Confirm guardrail installationPetit metalwork · Due 24/09
Scheduled
8 recipients selectedPublish report

Step 03

Check progress

At the next visit, find your checks, open items and site documents together.

Continuity between visits
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Progress by tradeTeam view

17 September visit · Building A

8/12Tasks completed
3Trades tracked
1Item to watch
Joinery75 %
3 of 4 tasks · Adjustments remaining
Tiling100 %
4 of 4 tasks · Quality checked
Painting25 %
1 of 4 tasks · Extra crew needed
Next site visit · 24 September

Features

The tools behind every result.

Site meeting reports

Prepare meetings, keep your own format and carry open items into the next report.

Site meeting reports →

Snag tracking

Locate each defect, assign a contractor and keep photos and deadlines together.

Snag tracking →

Explore the workflow with your team.

Start with your own documents and organisation to explore the features your team needs.

Let’s talk about your site workflow.

Site reports, snag tracking, progress checklists and document management: keep work moving between visits with Builddar.

Would you rather talk it through?

+33 6 67 33 82 14

Request your demonstration

Your information is used only to answer your request.

Frequently asked questions

Answers before you get started.