Main contractors

Organise remedial work. Keep the evidence of every correction.

Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.

Tracked repairs. A documented reception.

THE PRODUCT IN ACTION
builddar.Les Tilleuls /Building AML
SITE DRAWINGRoof · Revision B
Roof plan with snag 24 connected to its detail card2524Roof terrace
SNAG #024To action

Parapet joint to repair

Location
Building A · Roof
Responsible contractor
MMartin waterproofing
Due date
21/09/2026

In practice

Builddar for main contractors

Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.

01

Assign remedial work

A located snag, a trade and a contractor: each team can find the work assigned to it.

02

Document the correction

Attach after-work photos and messages to the original finding.

03

Prepare works reception

Identify remaining open snags and gather documents for the project supervisor.

The product at work

From the first action to the result.

Les Tilleuls development: follow the same project from the first action to the final document.

Step 01

Track every snag

During OPR inspections, locate defects on the drawing, attach photos and assign the contractors responsible for remedial work.

Located and assigned snags
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Snag trackingTeam view

Roof terrace · Drawing revision B

All 3To fix 1To verify 1Closed 1
Architectural roof terrace plan with located snags2425+
A · Roof
024
Parapet joint repairMartin waterproofing · 21/09
To fix
025
Vent outlet fasteningDurand ventilation · 22/09
To verify
026
Roof terrace cleaningMartin waterproofing · 18/09
Closed

Step 02

Verify snag closeout

The contractor reports a correction. Review the evidence and validate closeout; a reported fix alone is not validation.

Documented, validated closeout
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Snag closeoutTeam view

Snag #024 · Parapet joint

To verify

The repair is ready for inspection.

Contractor
Martin waterproofing
Location
Building A · Roof
Due date
21 September
Repair reported by contractor18/09 · Evidence added to the record
2
Inspection by the project supervisorCheck the joint before closing the snag
History retainedClose snag

Step 03

Prepare the reception record

Gather documents, reports and remaining open snags to prepare formal acceptance of the works.

A traceable reception file
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Works reception recordTeam view

Building A · Works reception

PDF
LES TILLEULS DEVELOPMENT

Works reception record

Trade 08 · Waterproofing

DecisionWith snags
Appendix2 located snags
AttachmentsPlan · Photos · Snag list
Record and appendices in one project file

Products for your work.

builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Snag trackingTeam view

Roof terrace · Drawing revision B

All 3To fix 1To verify 1Closed 1
Architectural roof terrace plan with located snags2425+
A · Roof
024
Parapet joint repairMartin waterproofing · 21/09
To fix
025
Vent outlet fasteningDurand ventilation · 22/09
To verify
01

OPR & Reception

Track and close out snags, through to the reception record.

  • Snag tracking
  • Snag closeout
  • Document management
  • OPR inspection reports
  • Works reception records
Explore OPR & Reception
builddar.Les Tilleuls Building AML
PROJECT WORKSPACE•••
Meeting report no. 12Draft

17 September meeting · 8 participants

AttendanceDiscussion points 3Attachments
DECISIONS & ACTIONS
01
Approve the façade colourArchitect · Due 21/09
To approve
024
Parapet joint to repairMartin waterproofing · Due 21/09
In progress
03
Confirm guardrail installationPetit metalwork · Due 24/09
Scheduled
8 recipients selectedPublish report
02

Work progress

Turn every site visit into a report and actions you can follow.

  • Site meeting reports
  • Snag tracking
  • Progress checklists
  • Construction document management
  • Construction reports
Explore Work progress

Explore the workflow with your team.

Start with your own documents and organisation to explore the features your team needs.

Let’s talk about your site workflow.

Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.

Would you rather talk it through?

+33 6 67 33 82 14

Request your demonstration

Your information is used only to answer your request.

Frequently asked questions

Answers before you get started.