Assign remedial work
A located snag, a trade and a contractor: each team can find the work assigned to it.
Main contractors
Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.
Tracked repairs. A documented reception.
2524Roof terraceIn practice
Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.
A located snag, a trade and a contractor: each team can find the work assigned to it.
Attach after-work photos and messages to the original finding.
Identify remaining open snags and gather documents for the project supervisor.
The product at work
Les Tilleuls development: follow the same project from the first action to the final document.
Step 01
During OPR inspections, locate defects on the drawing, attach photos and assign the contractors responsible for remedial work.
Roof terrace · Drawing revision B
2425+Step 02
The contractor reports a correction. Review the evidence and validate closeout; a reported fix alone is not validation.
Snag #024 · Parapet joint
Step 03
Gather documents, reports and remaining open snags to prepare formal acceptance of the works.
Building A · Works reception
Trade 08 · Waterproofing
Roof terrace · Drawing revision B
2425+Track and close out snags, through to the reception record.
17 September meeting · 8 participants
Turn every site visit into a report and actions you can follow.
The next stage of your project
Start with your own documents and organisation to explore the features your team needs.
Centralise snags by location and trade, coordinate remedial work and prepare closeout evidence for works reception.
Would you rather talk it through?
+33 6 67 33 82 14We'll call you back within one business day.
Your information is used only to answer your request.